Free Ungated Resource

Construction Meeting Minutes Template

A standardized, contract-ready construction meeting minutes template formatted with dotted numeric topics, attendee attendance, RFI logs, submittal statuses, and ball-in-court action tracking.

TEMPLATE // CONSTRUCTION_MEETING_MINUTES.TXT
PROJECT MEETING MINUTES
Official Project Record · Distribution Required Within 48 Hours
Project Name [Project Name]
Project / Job # [Job Number]
Meeting Date & Time [Date, 00:00 AM/PM]
Meeting Number Meeting #[00]
Location Jobsite Trailer / Virtual
Meeting Chair / Recorded By [Name, Title, Company]
1.00 ATTENDEES & DISTRIBUTION
Name Company / Role Email Present / Absent
[Name 1]General Contractor (PM)[Email]Present
[Name 2]Owner Representative[Email]Present
[Name 3]Architect of Record[Email]Present
[Name 4]Mechanical Subcontractor[Email]Present
[Name 5]Electrical Subcontractor[Email]Absent (Copies Sent)
2.00 REVIEW OF PREVIOUS MINUTES
2.01 Minutes of Meeting #[Previous Number] held on [Previous Date] were reviewed. No corrections or amendments noted. Minutes approved as written.
3.00 SAFETY & FIELD CONDITIONS
3.01 Jobsite Safety: Zero lost-time incidents reported this period. Superintendent noted upcoming crane pick scheduled for Thursday; perimeter traffic control plan reviewed.
4.00 SUBMITTAL REGISTER REVIEW
4.01 Submittal [Pkg #] — Switchgear Product Data: Electrical subcontractor submitted revision on [Date]. Architect/MEP engineer review turnaround due [Target Date]. BIC: MEP Engineer.
4.02 Submittal [Pkg #] — Curtainwall Mockup Shop Drawings: Glazing subcontractor awaiting structural deflection confirmation. Review pending. BIC: Structural Engineer.
5.00 REQUESTS FOR INFORMATION (RFIs)
5.01 RFI [Number] — [Subject / Spec Section]: Framing subcontractor identified structural opening interference at Level 4. Architect issued revised detail on [Date]. Work released to field. BIC: Closed.
5.02 RFI [Number] — [Subject / Spec Section]: Clarification requested on roof drain slope elevation. Response committed by [Target Date]. BIC: Civil Engineer.
6.00 SCHEDULE & 3-WEEK LOOKAHEAD
6.01 Critical Path Activities: MEP rough-in on Level 3 completes Friday. Dry-in milestone remains targeted for [Milestone Date].
6.02 Lookahead Inspections: City framing and rough-in inspection booked for Tuesday at 9:00 AM.
7.00 POTENTIAL CHANGE ORDERS (PCOs) & COST ISSUES
7.01 PCO [Number] — Lobby Terrazzo Finish Revision: Owner Rep confirmed approval of revised aggregate sample. GC submitting cost delta of $[Amount] for formal signature. BIC: Owner Rep.
8.00 ACTION ITEMS & COMMITMENTS REGISTER
Item # Action Required Ball-in-Court (BIC) Due Date Status
ACT-01 Issue signed approval for PCO 042 (Terrazzo) Owner Rep Sept 18 Open
ACT-02 Submit revised seismic bracing calculation for ductwork Mechanical Sub Sept 21 In Review
ACT-03 Issue response to RFI 105 (Roof drain slope) Civil Engineer Sept 19 Open
NEXT MEETING
The next meeting will be held on [Next Meeting Date] at [Time] at [Location / Video Link]. Any errors or omissions in these minutes must be submitted in writing within 48 hours of receipt.